Email a copy of 'In piling works, normally founding levels of bored piles are defined by using total core recovery or rock quality designation RQD. Are there any problems with such specification?' to a friend
* Required Field
Your Name: *
Your E-Mail: *
Your Remark:
Friend's Name: * Separate multiple entries with a comma. Maximum 5 entries.
Friend's E-Mail: * Separate multiple entries with a comma. Maximum 5 entries.
Image Verification: *
Close This Window