Construction of 5 slabs involves the use of 90 cum. of concrete, 7.2 MT of reinforcement and 800 sqm. of shuttering. A tender has to be submitted with the rates of reinforcement and shuttering to be included in the rate for concrete. by toppr

What should be the rate for concrete work (to be quoted in the tender), if the rates for (only) concrete, reinforcement and shuttering are INR 5000, INR 12000 and INR 900, respectively?