The principal function of prime coat in bituminous pavement is to protect the subgrade from moisture and weathering. Since the presence of moisture affects the strength of subgrade, the prevention of water entry
during construction is essential to avoid the failure of the pavement. In cold countries, by getting rid of moisture from subgrade, the danger of frost heave can be minimized.
Read More