Is structure engineering troubling you?
Do you face problems in solving even the basic problems?
If yes then look no further as engineeringcivil.com along with Er. Gobind Khurana and Er. Abhimanyu has taken an initiative to help civil engineering students in structure related queries. We are thankful to Er. Gobind Khurana, Er. Abhimanyu and Vincent T. H. CHU for being a volunteer in helping other engineers in solving problems related to structure design in R.C.C and Steel.
Expert 1
Name – Er. Gobind Khurana
Qualification:
1. Bachelor of Civil Engineering From Thapar University Patiala
2. Master of Structure Engineering from Delhi University.
Work Profile: Currently working as Consultant for structural problems in R.C.C and STEEL Design.
Expert 2
Name – Er. Abhimanyu
Qualification:
Bachelor of Civil Engineering From Thapar University Patiala
Training at site in Unitech ( during 6 month summer training)
Work Profile : Presently working as associate design engineer for Fluor Daniel India Pvt Ltd. Area of work is structural steel design and concrete foundations for both static and dynamics analysis ( mainly in oil and gas industry)
Expert 3
Er. Vincent T. H. CHU obtained the degree of civil and structural engineering in the University of Hong Kong. He is the author of the monthly column “The Civil FAQ” in the Hong Kong Engineer published by the Hong Kong Institution of Engineers and is the author of the civil engineering monthly columns “The Civil Q&A” and “The Civil Corner” on the websites on World Federation of Engineering Organization and the University of Science and Technology (American Society of Civil Engineers – International Student Group) respectively. He is the recipient of the Ombudsman’s Award 2007 under complaint-related category and Young Engineer of the Year Award 2008 (Merit) organized by the Hong Kong Institution of Engineers. He is also the author of the engineering book “200 Question and Answers on Practical Civil Engineering Works”, “Civil Engineering Practical Notes A-Z” , “Ask Vincent Chu (Common FAQ on Practical Civil Engineering Works)” and “The Underlying Reasons in Practical Civil Engineering Works”.
So if you have any query regarding the concerned matter, just drop a comment and we will try to solve it as soon as possible.
can we use stone dust in replacement of sad in concreting? will it give the same strength?
What is the proportion of cenocell vs cement
Is this possible,cement grade 20 convert into grade 200 and get same amount of cement.
what is gis?
i need environmental realated project topics
WHAT IS THE COMPOSITION OF MIX M100?
What is Cantilaver Beam in detail?
How to calculate 1cum of concrete?
from where i can get design procedure for peb without using staad
How does one calculate depth of sheet pile flood control weir? I saw the design example for sheet pile in sand but this pile would have no sand in front of it except at the canal bottom.
Is there any resource that might help me start my designing of plumbing system for multi-storey building? Its actually an apartment-type building consisting of 4 floors with an area per floor of 375 square meters. Please help. Its my final project for fluid mechanics.
I would like to know the range of good results for of following materials for specified purposes in terms of corresponding laboratory tests:
1. Aggregates for Concrete purposes
-Sieve analysis
-Water absorption
-Densities
-Los Angeles
2. Coarse Sand for Concrete purposes
-Sieve analysis
-Water absorption
-Densities
-Sand equivalence
3. Plaster sand
-Sieve analysis
-Water absorption
-Densities
-Sand equivalence
-Atterbag limits
4.Stone/ For soil stabilization purposes
-Densities
-Sand equivalence
5. Murrum soil/ For back filling purposes
-Sieve analysis
-Atterbag limits
-CBR Test
-proctor test
I just need some project report based on earth ship concepts….can anyone help us thank you
Sir COULD YOU PLEASE SUGHGEST HOW TO MEASURE ROBO SAND,METAL IN SITE IN VARIOUS SHAPES
Is soil stabilisation an alternative for compaction
can we provide vertical construction joints in raft foundations.
thanks
sir,i have an doubt in detailing of drawing which was an output of an Flat Slab given by SAFE SOFTWARE.
In that i have seen that for straight bar in middle strip it was given as 1-#8,11+1-#8,42@6′-0″ .
as per the software 1)number separator -(dash)
2)mark separator ,(comma)
3)spacing separator @(at).
So sir,please help me to resolve this details
During Piling ,How can we prevent soil contamination in the bore hole prior to concreting ??
How many types of piling ?
what is % of water remains in concrete after initial setting time .