By
Mr. S.L. Ghorpade
Under the guidance of Prof. A.B. Shendge
Dattakala Group of Institutions Faculty of Engineering, Swami – Chincholi (Bhigwan).
Abstract- The construction of tunnel is important for different purposes. They can be constructed for railways, roadways, pedestrian footways and can be built in hard rock, soft ground, river bed and are also used to convey Hydroelectric power, water stream, or as a sewer. The construction of Diversion Tunnel, Pressure Shaft, and Tailrace Tunnel to convey water is considered in this project. To identify Scheduling of different activities by various methods Network Diagram, C.P.M., P.E.R.T. and their cycle time is calculated. Scheduling for different activity is carried out with the help of Network Diagram & Primavera Software will be carried out in a project stage II. Study of Estimation for a Diversion Tunnel, Pressure Shaft, and Tailrace Tunnel by both methods. Excavation in heading and benching, Rock bolt support work, lining work is considered for cycle time and cost estimation calculation in Diversion Tunnel, Pressure Shaft, and Tailrace Tunnel. Estimation is also carried out by two methods. The comparison of two methods adopted for excavation work and estimation will be carried out in a project stage II.
Keywords- Scheduling, C.P.M., P.E.R.T., Gantt chart, Network Diagram, Estimation, Heading, Benching, Cycle time, Lining, Rock Bolts, Diversion Tunnel, Pressure Shaft, Tailrace Tunnel.
Read More
thank you for the explanation of civil engineering and the fields of civil engineering
how to get IES
you have to apply upsc engineering service examination first. the date of commencement of filling online form is 22 feb. website is upsc.gov.in. total no of question paper is 5. three paper are objective type and two are subjective type.
all the best
i am working as q/c engineer . we making rcc chimney 65 mtr. hight . at +11.100 to 12.900 mtr lvl 28 day compressive test fail so will any suggest what will i do for next
Can anyone plz send me any information on MultiCriteria utility theory and basalt fibre concrete.
I want to know how can we apply all our formulas before construction of any structre
how make concrete powder?
i want venturimeter 3d pictures
I want to know about skill of jr engineer in finishing work fo building
is it possible to locate or rotate column like; 1st floor to 2nd floor the column(200x400mm) orientation is N-S direction but 2nd floor to 3rd floor the column (400x200mm) orientation is E-W direction..??
Thank you very much for your good service.
very good
yes, we know that the worldwide only civil engineering ismain thing where the all solutions available .
i am too a civil engineer , i am on searching a flood control dams structures but some problems elaborated.
can anyone civil engineer help me to make more effective suitable structure other than counterfort structure in any heavy civil engineering flood control dams.
civil eng. In the making
civil engineering portal gives very related to civil subjects &partical .
so, please all civil related students visit this site once &thanks for civil engineering portal ………….//
i can suggested one thing so, please attached practical civil related site construction photos or images
Dear Sir,
I want to know the reinforcement detail of a beam, with bar positioned in two layers with the spacer bar inbetween.What is the length of reiforcement fro end for -ve reiforcement .
longitudinal cross section of a beam pl send
should 10th be cleared to studt c-engineering
should 10th must be cleared to study c-engineering
Best future of the civil eng.
i want do my mtech in computer aided engineering ……… suggest me the colleges