By
Mr. S.L. Ghorpade
Under the guidance of Prof. A.B. Shendge
Dattakala Group of Institutions Faculty of Engineering, Swami – Chincholi (Bhigwan).
Abstract- The construction of tunnel is important for different purposes. They can be constructed for railways, roadways, pedestrian footways and can be built in hard rock, soft ground, river bed and are also used to convey Hydroelectric power, water stream, or as a sewer. The construction of Diversion Tunnel, Pressure Shaft, and Tailrace Tunnel to convey water is considered in this project. To identify Scheduling of different activities by various methods Network Diagram, C.P.M., P.E.R.T. and their cycle time is calculated. Scheduling for different activity is carried out with the help of Network Diagram & Primavera Software will be carried out in a project stage II. Study of Estimation for a Diversion Tunnel, Pressure Shaft, and Tailrace Tunnel by both methods. Excavation in heading and benching, Rock bolt support work, lining work is considered for cycle time and cost estimation calculation in Diversion Tunnel, Pressure Shaft, and Tailrace Tunnel. Estimation is also carried out by two methods. The comparison of two methods adopted for excavation work and estimation will be carried out in a project stage II.
Keywords- Scheduling, C.P.M., P.E.R.T., Gantt chart, Network Diagram, Estimation, Heading, Benching, Cycle time, Lining, Rock Bolts, Diversion Tunnel, Pressure Shaft, Tailrace Tunnel.
Read More
i want design rules for biogas plant
plz help me
what is method of calculating quantity of material of mixture of mortar
hii sir,i want to know about the formation of different grade of concrete in briefly and the software of it?
wanna do interior designing , may i knw d details
hi…`i want ppt about demolition of structures using implosion technology
can u plz tell me how to design a column & beam for industry building
Hi,
Anyone can help me out regarding Autoclaving process & its machine,any indian company working on it,or steam curing process?
i need a design guide of hydraulic concrete weir
i am a student of 6th semester .I want to know the name of some books on Finite Element Method and matrix method.
i am fresh graduate in civil engineering i want become site incharge
i want ppt my topicis “importance of architectural planning and considerations under seismic analysis”
i m an pre final year student ….. i want do a project on any of the skyscrapers …..can u suggest me with any of the skyscrapers in india or abroad
I am a student of 4th sem. plz give me some ppt’s on GIS system….
hi….
My dream is to be a good civil engineer and my talent goes with constructing. Pls reply to me my practice to add more to my talent. Thanks……..
WHO DO WE GRADE CEMENT ,WHAT ARE THE TESTS TO DO SO .
WHAT IS ACT TEST .
i am very happy to visit this site for the fist time,wishing it all the best.
What is tributary area?
what is the difference between limitstate design @ working stress design?
Here in limit state we adopt partial factor of safety to structure ie;1.5 where as in working stress we take the actual load that comes to structure without taking any safety .
Hey everybody. i am a 6th semester student of civil engineering and currently doing research project on laminated fiber reinforced composites. the problem i have is that i have no equipment to test the samples under impact loading(low velocities) is there any way i could get the data on composites behaviour under impact loading??please reply
Hi,
I need to design a 16 storey apartment in Steel using STAAD. Please give your valuable guidance for how to proceed? in case if you have any previous design files (staad) please send it to me. Thanking you in advance