By
Mr. S.L. Ghorpade
Under the guidance of Prof. A.B. Shendge
Dattakala Group of Institutions Faculty of Engineering, Swami – Chincholi (Bhigwan).
Abstract- The construction of tunnel is important for different purposes. They can be constructed for railways, roadways, pedestrian footways and can be built in hard rock, soft ground, river bed and are also used to convey Hydroelectric power, water stream, or as a sewer. The construction of Diversion Tunnel, Pressure Shaft, and Tailrace Tunnel to convey water is considered in this project. To identify Scheduling of different activities by various methods Network Diagram, C.P.M., P.E.R.T. and their cycle time is calculated. Scheduling for different activity is carried out with the help of Network Diagram & Primavera Software will be carried out in a project stage II. Study of Estimation for a Diversion Tunnel, Pressure Shaft, and Tailrace Tunnel by both methods. Excavation in heading and benching, Rock bolt support work, lining work is considered for cycle time and cost estimation calculation in Diversion Tunnel, Pressure Shaft, and Tailrace Tunnel. Estimation is also carried out by two methods. The comparison of two methods adopted for excavation work and estimation will be carried out in a project stage II.
Keywords- Scheduling, C.P.M., P.E.R.T., Gantt chart, Network Diagram, Estimation, Heading, Benching, Cycle time, Lining, Rock Bolts, Diversion Tunnel, Pressure Shaft, Tailrace Tunnel.
Read More
I am working as Quality Diportment, Very much usefull Civil engneering.
i am warking in Shapoorji pollanji & co LTD. more Latast IS limits Please send.
Hi……………..
This is a very good site for civil engineers.
hi plz tell me the names of all exams in which a civil engg. can appear
Dear All,
I request your help for article of “Modulus Soil Sub grade Reaction”, refer to field survey investigation and literature approach.
Thanks a lot
Regards,
tatang s permana
Bandung Indonesia
its a very good website for civil enineers nd they can get more benifits
i really excited to join this group.
Its always proud to say ppl”i m a civil engineer”, n we r te ppl who’ve engineerd the world around u,turn around 360d n hav a look.Civil engineering is aspiring,n the website encourages ppl to make the world a better n brighter place to live.regards, Aejaz khan
nice site for civil enginerrs specially for up coming civil enginers
Its very nice site ( I thank’s to team of this web site Related members )
this great to see all the details on this site
From
Dubai
Shaker Ahmed ( Shah )
sir,
my self civil eng. , I want details of mix design of concrete (indian standard methods)
HI EVERYBODY
THIS IS HEMENDRANATH FROM 1st YEAR CIVIL IN SRM UNIVERSITY .I LEARNED MANY THINGS FROM THIS SITE.THIS IS VERY NICE AND USEFUL WEBSITE TO LIGHTENING THE UP COMING CIVIL ENGGS KNOW ABOUT NEW TECHNOLOGIES AND UPDATES IN CIVIL FIELD.
Sir,
What may be the modulus of elasticity of M60 grade of concrete at 03 days,28days & 90 days.
hi…frnz….
any one have ppt of precompression ….
plz help
the main difference between 53 grade and 43 grade cement is strength, 53 grade cement gain more strength in 28 days comaprison 43 grade, it will be 53n/mmsquare in 28 days with curing, and 43 grade cement will give strength- 43n/mm square in 28 dys with 28 days curing. 53 grade cement requre more water quantity than 43 grade cement and rate of heat of hydration is more in 53 grade cement.
what is the meaning of shear force and bending moment?
“Fall in Love with Civil Engineers,’Coz we Build our Love on a Firm Foundation and a Lifetime Contract” ^_^
-Eastern Visayas Estate University-
Ormoc City Campus
John Christopher Orio Trespeces (Batch 05-09)I hope ^_^
sir,
i am jihad ,doing civil eng; in coimbatore,i want realize the scope of civil construction in this global economic scare
hai frn.. me suren from malaysia..me like 2 stdy sivil eng.. r am i choose d ryt job…r tis job intersting..tq.
sir can u plz help in making m25 concrete mix just give me details of mmaking it with 10mm n 20mm aggregrate