By
Mr. S.L. Ghorpade
Under the guidance of Prof. A.B. Shendge
Dattakala Group of Institutions Faculty of Engineering, Swami – Chincholi (Bhigwan).
Abstract- The construction of tunnel is important for different purposes. They can be constructed for railways, roadways, pedestrian footways and can be built in hard rock, soft ground, river bed and are also used to convey Hydroelectric power, water stream, or as a sewer. The construction of Diversion Tunnel, Pressure Shaft, and Tailrace Tunnel to convey water is considered in this project. To identify Scheduling of different activities by various methods Network Diagram, C.P.M., P.E.R.T. and their cycle time is calculated. Scheduling for different activity is carried out with the help of Network Diagram & Primavera Software will be carried out in a project stage II. Study of Estimation for a Diversion Tunnel, Pressure Shaft, and Tailrace Tunnel by both methods. Excavation in heading and benching, Rock bolt support work, lining work is considered for cycle time and cost estimation calculation in Diversion Tunnel, Pressure Shaft, and Tailrace Tunnel. Estimation is also carried out by two methods. The comparison of two methods adopted for excavation work and estimation will be carried out in a project stage II.
Keywords- Scheduling, C.P.M., P.E.R.T., Gantt chart, Network Diagram, Estimation, Heading, Benching, Cycle time, Lining, Rock Bolts, Diversion Tunnel, Pressure Shaft, Tailrace Tunnel.
Read More
Thanks for sharing your knowledge, it’s very useful to me.
Thanks
Can you please help me choose a topic for my final project on water and soil
PLz share Steel Cureved plate design.
Thanks for this web site. Whether a precast concrete Overhead service reservoir can be made in India of capacity 1 Lakh to 4 Lakhs.
Pre-cast concrete of Over Head service reservoir
Such an interesting website for me as a future C.Engineer!
All your articles are very informative. As a civil engineering student, these articles are great resources for me.
its really interesting..it helps me a lot more to understand the wide engineering industry,…big thanks!,..AS A FUTURE ENGINEER I NEED THIS…
Send me your shape column tie cutting length how we find out
Y- Shape column tie cutting length how to find out
it’s really nice
why wet sieve analysis is required
wet sieve analysis is required for classification of soils. To know whether more than 50% passing through 75 microns or not. If more than 50% particles passing through 75 microns, we can call it as fine grained soils else coarse grained soils.
Please elaborate your question.
can we use 8mm tor bar in foundation as main reinforcement.
Let me know about VTM Compaction?
That’s my course civil engineering.
And its really nice according to sahib.
Send me a map for a cross section of a concrete tank
I want complete task wise details of WTP , raw water main pump and pumping distribution details .
During several years of experience I realized what civil engineering student learn in university is just a tiny part of necessary knowledge for this profession. Thank you for your website that provides good information
Thank you for providing nice information about civil engineering’s influence in shaping for young engineers ,It will definitely to help for Civil Engineering students.
Hi i wish to every one i want one clarification . i saw my country side in india above 40&45 years before constructed houses in side without air condition,and cooler. their is temperature is low condition is cool how is possible ,but new building fan is not enough must want ac or minimum want cooler. what is reason is hidding in behaind of cooling