By
Mr. S.L. Ghorpade
Under the guidance of Prof. A.B. Shendge
Dattakala Group of Institutions Faculty of Engineering, Swami – Chincholi (Bhigwan).
Abstract- The construction of tunnel is important for different purposes. They can be constructed for railways, roadways, pedestrian footways and can be built in hard rock, soft ground, river bed and are also used to convey Hydroelectric power, water stream, or as a sewer. The construction of Diversion Tunnel, Pressure Shaft, and Tailrace Tunnel to convey water is considered in this project. To identify Scheduling of different activities by various methods Network Diagram, C.P.M., P.E.R.T. and their cycle time is calculated. Scheduling for different activity is carried out with the help of Network Diagram & Primavera Software will be carried out in a project stage II. Study of Estimation for a Diversion Tunnel, Pressure Shaft, and Tailrace Tunnel by both methods. Excavation in heading and benching, Rock bolt support work, lining work is considered for cycle time and cost estimation calculation in Diversion Tunnel, Pressure Shaft, and Tailrace Tunnel. Estimation is also carried out by two methods. The comparison of two methods adopted for excavation work and estimation will be carried out in a project stage II.
Keywords- Scheduling, C.P.M., P.E.R.T., Gantt chart, Network Diagram, Estimation, Heading, Benching, Cycle time, Lining, Rock Bolts, Diversion Tunnel, Pressure Shaft, Tailrace Tunnel.
Read More
Sir,
Can you please tell me the concrete mix design for Concrete Cloth, and Textile Reinforced Concrete?
sir. i would like to know about the job opertunities for a civil engineer
hello sir,
i just wanna ask that what should i go for now when i am about to complete my civil engineering this year……?
hi iam marwa student in final year in civil engineering \mosul university iwant help of my congragolation project of some designs of malls or mulity storry buildings
thanks
eng.marwa
sir i m interested in knowing dat wt r d projects dat cn be taken up by astudent of 2nd year civil branch. Do tl me bout d newer avenues after btech dan mtech or ms if any.
I L BE THANKFUL TO U FR DES INFORMATIONS
Pls, i want to the project assign to a 1st year civil engr. Student
What are the qualities required 4 one to be a good civil engineering?
sir,i hav finished my +2 & hav taken civil branch in my b.tech
i would like 2 know abt dha jobs at dha end my academics
and also civil job placements in india
sir me completed btech and now working as junior engineer in a firm for one year, now i wish to work in designing and planning field what type of course should i learn
Iam an engineer with 18 years of experience , I have noticed that while constructing buildings the depth of beam with uniformly distributed load (slab),for this You can take for 10′ span 10″ beam, for 11′ span 11″ beam, for 12 feet span 12 inches of beam depth and so on practically.( If you want to test design and verify , I hope i will be correct)
sir, i m harshita belong a small city chhindwara in mp . i m geting addmition in 1est year & choose civil branch i would like 2 know abt dha jobs at dha end my academics
and also civil job placements in india.
Thanx sir
sir
i’m doing b tech in civil engg. and presently i’m in 5th sem. i just want to know what all softwares should i learn if i want to get into a good design company and what all subjects to stress on.
please give me a detailed report on interlocking concrete pavers
sir,
i am a btech 1st year student.i want to know that anyone get 2 n 3 back in his civil engineering btech carrer.because of such back in btech can he face diffculty in job?
i am civil enginearing first year student.sir plz tell me what is scope for civil enginearing?
please give a detailed report on the payment services for the various fields and projects
hallo sir,
am a third year Civil Engineering student doing extremely well in school.
Does this site offer advice on projects to e undertaken? please reply.
this is a challenge to geneous engineer will plz give a most ecomomical solution for constructing fencing (any suitable Material for 1.6 Km. shalow water bodies at kirk area.
please give me a detailed report on interlocking concrete pavers,that means mix desings for strength of blocks 60mm,80mm,100mm.
This really a Great Work being done.