By
Mr. S.L. Ghorpade
Under the guidance of Prof. A.B. Shendge
Dattakala Group of Institutions Faculty of Engineering, Swami – Chincholi (Bhigwan).
Abstract- The construction of tunnel is important for different purposes. They can be constructed for railways, roadways, pedestrian footways and can be built in hard rock, soft ground, river bed and are also used to convey Hydroelectric power, water stream, or as a sewer. The construction of Diversion Tunnel, Pressure Shaft, and Tailrace Tunnel to convey water is considered in this project. To identify Scheduling of different activities by various methods Network Diagram, C.P.M., P.E.R.T. and their cycle time is calculated. Scheduling for different activity is carried out with the help of Network Diagram & Primavera Software will be carried out in a project stage II. Study of Estimation for a Diversion Tunnel, Pressure Shaft, and Tailrace Tunnel by both methods. Excavation in heading and benching, Rock bolt support work, lining work is considered for cycle time and cost estimation calculation in Diversion Tunnel, Pressure Shaft, and Tailrace Tunnel. Estimation is also carried out by two methods. The comparison of two methods adopted for excavation work and estimation will be carried out in a project stage II.
Keywords- Scheduling, C.P.M., P.E.R.T., Gantt chart, Network Diagram, Estimation, Heading, Benching, Cycle time, Lining, Rock Bolts, Diversion Tunnel, Pressure Shaft, Tailrace Tunnel.
Read More
thank you for all
DEAR SIR IAM AMJAD HUSSAIN BHANGWAR FROM NAWABSHAH SINDH PAKISTAN
I WANT TO KNOW TAHT HOW MANY CLASSES OF SOIL AND CONCRETE
How to calculate Quantities in Civil Engg.
I think the common codes required in the course of B.Tech like IS:875, IS:800 and IS:456 should be freely available for reference to the students. Please provide these codes on this site.
please send me a detailed M25 Mix design calulations
thank you sir
I am 17 years old and i would like to study civil engineering . Can i know about the scope of this purticular field.
thanks!
Please tell me,modern concrete grade and their strength respectivelly
Hi sir. I am a student at bayero uni kano nigeria reading B.eng civil engr(level 300) but teach us with less practical what kind of advice woud u give so that i can be a good eng of example .
NO ANY OTHER ONE TO CREATE AFTER GOD THEREFORE I AM urging the author of this site to change the slogon above cuz its not appropriate there
Sir,
Please send me detailed calculations of M-30 and M-25
Warmely thanks
i also very happy 2 dis 1
sir,
i am studing BE civil engg.
please send the M25 grade calculation details.
thinkyou,
hello i m manika frm delhi studyng in 10th class
sir, i want to do civil engineering after appearing 10th class bt i m not to gud in studies
i hv heard a lot about dis course
so give me advice how cn i get admission or how i prepare fr dis course
tnxxxx
must reply
sir i am sekar workin in a construction company i want to know about
the stress strain
sir i am studing civil engineering diploma i need the exact details about
the curing
Thanks, i like the wonderful presentation above. Please can your tell me or give me detail informations on all i need to know in Highway Engineering as encapsulated in Civil Engineering practice.
Pls. Can u explain 2 us in detail? Transportation as a branch of civil engineering.
I,m working as an engineer in public sector ,What precautions and practices should be apply by me while executing the works?
Dear friends,
If any body has following ISO codes pleaase forward to me.
376:1999
376:2004
Pleaase help. Great help.
regards
Namal
I am the event head of the upcoming bridge making contest in our Delhi college of Engineering during the technical fest in february 2010.I want to know that “how can we estimate the load which a bridge can carry,i.e. (Estimated load)?” and ” how to calculate the ‘best estimated load capacity'(belc)?”
Actually I need this to finalise the results of the bridge making competition.