By
Mr. S.L. Ghorpade
Under the guidance of Prof. A.B. Shendge
Dattakala Group of Institutions Faculty of Engineering, Swami – Chincholi (Bhigwan).
Abstract- The construction of tunnel is important for different purposes. They can be constructed for railways, roadways, pedestrian footways and can be built in hard rock, soft ground, river bed and are also used to convey Hydroelectric power, water stream, or as a sewer. The construction of Diversion Tunnel, Pressure Shaft, and Tailrace Tunnel to convey water is considered in this project. To identify Scheduling of different activities by various methods Network Diagram, C.P.M., P.E.R.T. and their cycle time is calculated. Scheduling for different activity is carried out with the help of Network Diagram & Primavera Software will be carried out in a project stage II. Study of Estimation for a Diversion Tunnel, Pressure Shaft, and Tailrace Tunnel by both methods. Excavation in heading and benching, Rock bolt support work, lining work is considered for cycle time and cost estimation calculation in Diversion Tunnel, Pressure Shaft, and Tailrace Tunnel. Estimation is also carried out by two methods. The comparison of two methods adopted for excavation work and estimation will be carried out in a project stage II.
Keywords- Scheduling, C.P.M., P.E.R.T., Gantt chart, Network Diagram, Estimation, Heading, Benching, Cycle time, Lining, Rock Bolts, Diversion Tunnel, Pressure Shaft, Tailrace Tunnel.
Read More
i wanted to know the latest topics in civil engg. for paper presentations in college. any latest development in civil engg……..whether transport engg or environmental engg.
i want all data for civil work detail
i am confused on what part of engineering to study please help.
Dear sirs,
I need yours help,
I am studies 8th class discontinue school, in 1999,
Then after i learn Auto cad software for drafting.
Know i want studies civil engineer so how should
I start And one more thing i am in Gulf I am working as a civil 4men
Know i make 2 commercial building and 3 villas in total 2 years
My comp staff is 40 members.
But i don’t know in one Cubic Meter Concrete How much Cement, Sand,
Aggregate if any one help me i am so thanks full to you
Dear Sir,
Please send me detailed calculations of M-30 and M-25
Warmely thanks
dear sir,
I need M 20 Gradge of concrete for maximum size of Aggregate 40 mm. what can i do?? i need your Repaly thank you…….
R/S
Plz tell me about any short or long term course of concrete technology,in india. thanking u
any new research or information in civil engineering
Resp Sir,
Please can u send me Concrete Mix design step & there details as per IS Method & DOE method.
Sir,
Please send me detailed calculations of M-30 and M-25
Warmely thanks
Dear friends,
If any body has following ISO codes pleaase forward to me.
376:1999
376:2004
Pleaase help. Great help.
regards
nitin
at first thank you sir , and gentily I want a good summary in civil engineering sectors
pls give me the nominal mix design of M20 concrete.
Dear Sir,
I want to know What precautions and practices should be apply by me while executing the works in open foundation of 15M bridge, if intercept with hard rock at the depth of 1m about 40 percent of the total foundation
area, Wheather it is safe to provide dowel bar,if yes in what manner is there any specification?
Hi,
sir iam a first year student
i want to know about the ME scope in future???????????
latest development in civil engineering
& about the risk management
dear sir/madam,
I WANT SPECIALISED COURSES OFFERED IN ME
what is design concept of graviloft wall .how earthquake effect is accounted for
I am working on replacement of steel in manhole covers. I need the conventional steel reinforcement design of manhole cover for covers circular and rectangular in plan. Please drop links and info. Thanks.
I need some help on civil engineering project , you will be paid. If you are interested e-mail me