Abstract- The construction of tunnel is important for different purposes. They can be constructed for railways, roadways, pedestrian footways and can be built in hard rock, soft ground, river bed and are also used to convey Hydroelectric power, water stream, or as a sewer. The construction of Diversion Tunnel, Pressure Shaft, and Tailrace Tunnel to convey water is considered in this project. To identify Scheduling of different activities by various methods Network Diagram, C.P.M., P.E.R.T. and their cycle time is calculated. Scheduling for different activity is carried out with the help of Network Diagram & Primavera Software will be carried out in a project stage II. Study of Estimation for a Diversion Tunnel, Pressure Shaft, and Tailrace Tunnel by both methods. Excavation in heading and benching, Rock bolt support work, lining work is considered for cycle time and cost estimation calculation in Diversion Tunnel, Pressure Shaft, and Tailrace Tunnel. Estimation is also carried out by two methods. The comparison of two methods adopted for excavation work and estimation will be carried out in a project stage II.
Keywords- Scheduling, C.P.M., P.E.R.T., Gantt chart, Network Diagram, Estimation, Heading, Benching, Cycle time, Lining, Rock Bolts, Diversion Tunnel, Pressure Shaft, Tailrace Tunnel.
Read More
i am student of be 2nd year of m.i.t.s (gwl) pls. give me suggestion for training
sir i’m a student of civil engg
i need info about IES in civil engineering………
hi….i really wanna do civil engineering in the future …is it difficult???
sir,
i have finished my 12th std and i like civil branch very much.plz, advice me for my career.
Please i need some softwares for civil engineers.u can send them to my e-mail.thanks
HELLO SIR I AM CIVIL 3RD YEAR STUDENT I KNEW CIVIL ENGINEERING FROM THIS SITE THANKS TO ALL
Dear Sir,
I am just surprize regarding the mix design of M60, where is no maintioning workable value, Type of cement and Admixture, Addetives and it is sure that it wont work at all.
Please confirm all thoes factors and we will be thankful to you.
Sir, i am working as site engg, i want minimum cement content for mix M30 & M40 without fly ash and superplasticizer and with plasticizer.
dear sir/madam….am first year B.E civil …
i want some t shirt quotes about civil enginner
Give me M25 design mix
hello sir,
i have just finished 2nd year in civil eng. from jadavpur university in kolkata.
please, advice me for necessary steps to be followed by me for qualifying in IES and GATE.
can u tell me how to get the right point to rebound..? how thick the surface concrete to remove before to rebound..? and can i rebound the weat concrete..?
can u tell me how to get the right point to rebound..? how thick the surface concrete to remove before do the rebound..? and can i rebound the weat concrete..?
civil engineering is great, in this career we can help to create a safer world.
pls knidly send to me comprhensive note on the role of database to
civil engineer
Dear Sir/Madam
I m in b-tech third year civil engineering…
i wants summer training Report
pls help me to find!!!
THANK YOU
hello
i m in B.E. civil final year from bvm eng.college(gujarat)
i want to do higher studies,so which course i may prefer for M.E.
Dear Sir
I want to know about tremix flooring prosidure,specification,technical reason for doing
this flooring and IS Code no for this flooring
Dear Sir/Madam,
I am doing research in the concrete field i need how to calculate the cement, water, admixtures, sand, coarse aggregates reuired for the proportions: 0.44 : 1 : 2.414 : 3.146
i want to do civil engneering, so pls help me.thnk you .