By
Mr. S.L. Ghorpade
Under the guidance of Prof. A.B. Shendge
Dattakala Group of Institutions Faculty of Engineering, Swami – Chincholi (Bhigwan).
Abstract- The construction of tunnel is important for different purposes. They can be constructed for railways, roadways, pedestrian footways and can be built in hard rock, soft ground, river bed and are also used to convey Hydroelectric power, water stream, or as a sewer. The construction of Diversion Tunnel, Pressure Shaft, and Tailrace Tunnel to convey water is considered in this project. To identify Scheduling of different activities by various methods Network Diagram, C.P.M., P.E.R.T. and their cycle time is calculated. Scheduling for different activity is carried out with the help of Network Diagram & Primavera Software will be carried out in a project stage II. Study of Estimation for a Diversion Tunnel, Pressure Shaft, and Tailrace Tunnel by both methods. Excavation in heading and benching, Rock bolt support work, lining work is considered for cycle time and cost estimation calculation in Diversion Tunnel, Pressure Shaft, and Tailrace Tunnel. Estimation is also carried out by two methods. The comparison of two methods adopted for excavation work and estimation will be carried out in a project stage II.
Keywords- Scheduling, C.P.M., P.E.R.T., Gantt chart, Network Diagram, Estimation, Heading, Benching, Cycle time, Lining, Rock Bolts, Diversion Tunnel, Pressure Shaft, Tailrace Tunnel.
Read More
sir,
I want to take civil branch in B.tech,but some time i feel in civil branch job opportunites is less compare to other branches.please tell me about civil branch and job opportunites
hai sir !kindly tell me where I can get more information about mechanical engineering?
Everyone is saying that civil engg is not suitable for a girl.May i know why they are saying like that and is it true?
Sir,
I am a student studying b.tech in civil engg.So sir what type of special courses should be taken so that I can get a better placement in any MNC company for having a bright future.
hai… are dip in engg have a(a)level in gov college or semi gov college… pls help me becouse my friends all way say like that… i dint belive its… tq
I am passed B.Tech Civil Engineering and i want know that sutable for me MBA or M.Tech
Which subject or field.
hai freinds i am janardhan now i am B.tech first year now coming to the groups which is the best course please send me .is it civil or mechanical or chemical is the best please send about the groups
we want more information about civil engineering branches. this is more useful to our.
Sir, I completed intermediate. Now I want to take a group civil engineering. I don’t know any background about civil engineering but, I like drawing very much so many tell me, If you take civil engineering there is tough drawings.That’s why I am fearing about this matter.Please suggest me sir.
This is avery help full website for civil engineers. Thanks for creating such a beautiful website.
kindly send the MIX DESIGN OF DIFFERENT CONCRETE MIX DESIGN AND ALSO WHAT IS THE minimum compressive strength concrete cube or cylinder
Thanks,
Regards,
Bazarah
dear sir
i‘m a last year civil engg student.i ve to do project and seminar in this sem….
plz tell me some topics on new developments in civil engg..
Sir,
Can some body post How to calculate quantities in mix design.
For ex- M20 grade concrete (quantity of cement, quantity of sand n aggregate in kgs)
for 1 cu m.
what are the system of measurements adopted for brick work of building for govt in India.
a) For Full brick length x width x height. in cubic meter
or
b) Length x width x height – volume of mortar
similarly
for half brick work
a) length x height ( or width) in sq M.
b) length x height ( or width) – (minus) volume of mortar) in sq m.
sir,
iam pass in second year.iam confusion about in B-Teach what group i want to take please tell in this groups only
Degree Programs at IIITs:
1.Chemical Engineering
2.Civil Engineering
3.Computer Science Engineering
4.Electronics & Communications Engineering
5.Materials Science Engineering and
6.Mechanical Engineering
sir i am complete intermediate……….. i have intersted in civils…….. what is the future about this
sir i am complete intermediate……….. i have intersted in civils…….. what is the future about this one
what r the branches i civils & also subjects
quantity of cement per 100 cubic feet of concrete M-7.5 (1:4:8), M-10 (1:3:6), M-15 (1:2:4), M-20 (1:1 1/2:3); M-25 (1:1:2)
hello sir,
i m a 3rd sem. Student of civil engg. Stream and want to know about projects regarding transportations engg. Or bridges engg.
Please help me to overcome from my anxiety
thankfull to ur act of kindness