By
Mr. S.L. Ghorpade
Under the guidance of Prof. A.B. Shendge
Dattakala Group of Institutions Faculty of Engineering, Swami – Chincholi (Bhigwan).
Abstract- The construction of tunnel is important for different purposes. They can be constructed for railways, roadways, pedestrian footways and can be built in hard rock, soft ground, river bed and are also used to convey Hydroelectric power, water stream, or as a sewer. The construction of Diversion Tunnel, Pressure Shaft, and Tailrace Tunnel to convey water is considered in this project. To identify Scheduling of different activities by various methods Network Diagram, C.P.M., P.E.R.T. and their cycle time is calculated. Scheduling for different activity is carried out with the help of Network Diagram & Primavera Software will be carried out in a project stage II. Study of Estimation for a Diversion Tunnel, Pressure Shaft, and Tailrace Tunnel by both methods. Excavation in heading and benching, Rock bolt support work, lining work is considered for cycle time and cost estimation calculation in Diversion Tunnel, Pressure Shaft, and Tailrace Tunnel. Estimation is also carried out by two methods. The comparison of two methods adopted for excavation work and estimation will be carried out in a project stage II.
Keywords- Scheduling, C.P.M., P.E.R.T., Gantt chart, Network Diagram, Estimation, Heading, Benching, Cycle time, Lining, Rock Bolts, Diversion Tunnel, Pressure Shaft, Tailrace Tunnel.
Read More
very helpful site for all civil engineers
I am fresh civil Engineer ,I got some knowledge about civil engineers background.
try for employment and serve for nation
Ya!no chance superb site:-)every civil eng must visit tis site it’s very helpful one:-)
Yeah Really helpful, and some of this part is like my subject at University.
Q. when designing a first floor column the effective hight is usually taken as 3.15m that means from the DPC to the suffit of the second floor slab plus slab thickness, my Q is what happens to the column distance from DPC to foundation depth of column base,bearing in mind that practically some foundation depth get up to 2.5m b4 getting to DPC level due to the tepography of the site. shouldn’t the column dist. be 0.7L starting from foundation base to the slab.thanks.
its very useful site in civil engineering students
am feel well in civil engineer,its very nice to shere with other people(Engineer) like me
I find this site very helpful and informative to Engineers
I am feeling good to read this site…..
This site is one of the best i’ve come across. I encourage every colleague to be part of this.
hello sir, my name is vickey…im successfully completed my diploma in civil engineering in 2005.that situation, i cant get continue my degree program, bcoz my family commitment..but my ambition is be a successful structure engineer.nw im 27 years old, working as structural draftsman in malaysia..so i dono how to achieve my ambition…if u dont mind, can you advice n saw me the way to continue my degree sir?thanks
I want to know the best universities for masters in Construction and Structural engineering. Please let me know.
hi, i am a student of civil engineering of BUET. i have chosen “modeling travel time under the influence of on street parking”…..can anyone help by providing some useful links for this topic?
This is a wonderful site for civil engineering
This is very helpful for civil engineers.. thanks to authors
hi friends. this is one of the best site for civil engineers as knowledge point of view .. i advice every mjcet .hyderabad .student to be visiting this site for upgrading oneself …cio .bi
SIR I AM CIVIL ENGG STUDENT I WANA TO JOB IN NTPC HOW CAN IT POSSIABLE
Our old drawing specifies use of MS Round bars as reinforcement, whereas, we have HYD bars. Now how to adjust the spacing / diameter.Kindly give your valuable advice.
I am civil Engineer ,I got some knowledge about civil engineers background.
Whats the use of LIGHT WEIGHT CONCRETE?
hi, i am studying in civil engg..3rd yr……i am interest from civil construction project. pls.help.in project topic